Grant information disclosure

Developments supporting the adaptation of PATA JÓZSEF Kft. to modern business and production challenges

Project ID
GINOP_PLUSZ-1.2.1-21-2021-04399
Grant amount
HUF 353,653,283
Grant intensity
70%
Completion (actual)
6 November 2023
Beneficiary information block
Project details

Name of the beneficiary company: PATA JÓZSEF Gépipari Kft. Application identification number of the investment: GINOP_PLUSZ-1.2.1-21-2021-04399 Contracted grant amount: HUF 353 653 283 Grant intensity: 70% Project objective: Developments will be implemented to help adapt to business and production challenges: – Training; – Purchase of new equipment resulting in technological development; – Infrastructure and real estate investment; – Advisory services; – Application of technologies utilising renewable energy sources, the aim of which is to cover the energy needs of economic and production processes and of the buildings within the plant by generating renewable energy – purchase of equipment. The project brings far-reaching changes affecting every employee of the company: we support our employees with language training, expand our production line by purchasing equipment, build a new property with which we can increase our production capacity, and support our business with the advisory services specified in the project (developing relevant training, personality- and skills-development programmes, preparing a training plan). We are installing a solar panel system, with which we aim to reduce our ecological footprint (covering the energy needs of economic and production processes and of the buildings within the plant by generating renewable energy).

Actual project completion date: 6 November 2023.

Infocommunication development at PATA JÓZSEF Kft.

Project ID
GINOP-3.2.2-8-2-4-16-2019-01742
Grant amount
HUF 9,584,689
Grant intensity
40%
Completion (planned)
31 March 2021
Beneficiary information block
Project details

Name of the beneficiary company: PATA JÓZSEF Gépipari Kft.

Application identification number of the investment: GINOP-3.2.2-8-2-4-16-2019-01742

Contracted grant amount: HUF 9,584,689

Grant intensity: 40%

Project objective: The Infor COM enterprise resource planning system will be introduced with the following modules: – Corporate CRM, sales module – Finance and accounting – Workflow management system – A system using mobile technology linked to a given functional area. The hardware and network equipment required for operation will also be purchased. The result of the project is complex: it brings changes affecting every employee of the entire company and strongly supports our already operating Industry 4.0 technology. Thanks to this, we obtain an objective and up-to-date picture of our production and inventories, which makes our processes far more transparent and better organised and makes our production planning more accurate.

Planned project completion date: 31 March 2021.

Support for the technological modernisation of micro, small and medium-sized enterprises

Project ID
GINOP-1.2.10-19-2020-00152
Grant amount
HUF 40,000,000
Grant intensity
60%
Completion (actual)
13 November 2020
Beneficiary information block
Project details

Name of the beneficiary: Pata József Gépipari Kft.

Project identification number: GINOP-1.2.10-19-2020-00152

Contracted grant amount: HUF 40,000,000, i.e. forty million forints

Grant intensity: 60%

Project completion date: (the date of the last invoice or the date of the last commissioning, whichever is later.) 13 November 2020.

Description of the project content: The following was purchased under the project: 1 FANUC spot welding robot cell, together with additional equipment and accessories. As a result of the development, production time is decreasing, our productivity is rising, the quality of the manufactured products is improving, we can expand our size range, and we are also able to weld together large, shaped units consisting of several parts.

Development of the supplier capability of Pata József Kft. by increasing capacities in quantity and quality

Project ID
GINOP-1.3.3-16-2018-00027
Grant amount
HUF 274,170,877
Grant intensity
50%
Completion (actual)
20 March 2020
Beneficiary information blockBeneficiary information block
Project details

Name of the beneficiary: Pata József Gépipari Kft.

Project identification number: GINOP-1.3.3-16-2018-00027

Contracted grant amount: HUF 274,170,877, i.e. two hundred and seventy-four million one hundred and seventy thousand eight hundred and seventy-seven forints

Grant intensity: 50%

Project completion date: (the date of the last invoice or the date of the last commissioning, whichever is later.) 20 March 2020.

Description of the project content: The following was purchased under the project: 1 Salvagnini laser cutter, 1 Salvagnini press brake, 1 Costa deburring machine, 1 Galdabini hydraulic press, 2 FANUC spot welding robot cells and 1 Fanuc arc welding robot cell, IT equipment, and a basic enterprise management system. We also made use of MEBIR preparation, certification, market research and training. As a result of the development, we were able to increase our capacities, we opened up to new technologies, production time is decreasing, our productivity is rising, the quality of the manufactured products is improving, we can expand our size range, and we are also able to weld together large, shaped units consisting of several parts.

Increasing the competitiveness of Pata József Gépipari Kft. through the purchase of new equipment

Project ID
GINOP-2.1.8-17-2018-02665
Grant amount
HUF 19,808,369
Grant intensity
50%
Completion (planned)
30 April 2019
Beneficiary information block
Project details

Name of the beneficiary company: PATA JÓZSEF Gépipari Kft.

Application identification number of the investment: GINOP-2.1.8-17-2018-02665

Contracted grant amount: HUF 19,808,369

Grant intensity: 50%

Project objective: expansion of the equipment base of Pata József Gépipari Kft.

The new equipment improves the company’s production efficiency and also supports the manufacture of new types of products. A server and a 3D printer were purchased to support the administrative processes of production, as well as two welding machines and a compressor in connection with our manufacturing activity. This equipment helps the company work more efficiently and thereby improves the profitability of our business.

Planned project completion date: 30 April 2019.